Rough, final and touch-up cleans for commercial new builds and renovations so the handover is genuinely move-in ready, not just swept.

A building isn’t move-in ready when the contractor signs off. It’s ready when the dust is out of the HVAC vents, the stickers are off the glass, the drywall compound is chipped off the floor and the punch list is closed.
Premier Cleaning & Janitorial is the post-construction cleaning partner for commercial general contractors, developers and end-user clients across Mobile and Baldwin County. Commercial only we don’t take residential builds.
Post-construction is our fastest-turnaround service. When a certificate of occupancy inspection or a tenant move-in date is driving the schedule, we can usually mobilize within 48 to 72 hours.
Scope of work
Buyers care about frequency more than task lists. Here is exactly what happens when.
Who we serve
Buyer education
Most clients only know about Phase 2. Understanding all three is how you avoid paying for the same square footage twice.
The broom-clean pass once framing and the major trades are complete. Bulk debris removal, sweeping and vacuuming, and wiping of major surfaces. This happens before paint and finish trades arrive. Most general contractors handle it with site labor — we'll take it if you'd rather not tie up your crew.
The substantial one. Everything is cleaned in detail: window stickers removed, drywall compound chipped from floors, paint splatter cleared, all surfaces wiped, fixtures polished, restrooms detailed and HVAC vents dusted. This is what most clients mean when they say post-construction cleaning, and it is what gets a building through a walkthrough without a punch item for cleanliness.
A targeted second pass once punch-list trades have returned — cleaning up after the final paint touch-ups, caulking and fixture corrections that all happened after the final clean. Frequently skipped, and it's the difference between a building that looks new at handover and one that still looks new sixty days later.
Pre-inspection, dust, trash, wipe down, restrooms and break rooms, floors, final inspection. Same order, every service night, every building we clean.
Nightly checklist
Pre-inspection walk
Dust — Top-Down
Trash and Recycling
Wipe Down and Disinfect
Restrooms and Break Rooms
Floors
Final Inspection
GPS clock-in verified
Crew 04 · Mobile, AL
Ideally during framing, so we can pre-book the final clean window against the project schedule. Realistically most GCs call two to four weeks before final walkthrough. We can often accommodate same-week requests depending on crew availability, but the earlier the better.
No. We handle commercial new builds, tenant improvements and renovations only.
Yes. We regularly clean polished concrete, hardwood, natural stone, brass, copper and specialty mill work using surface-appropriate chemistry. Acidic cleaners permanently etch marble and limestone, so we identify every finish before choosing product.
We work whatever schedule the site requires, including escorted 24-hour access on secure projects. Every employee is background-checked before their first shift, which matters on federal, medical and financial build outs.
It depends on square footage and finish complexity. A 5,000 sq ft office build out typically takes one crew day for Phase 2. Larger or more detailed projects are scheduled against your walkthrough date and staffed to hit it.
Per square foot rather than hourly for new construction, because the scope is predictable. Renovation work on existing occupied buildings is often quoted hourly because condition varies. We assess on site before quoting either way.
We remove cleaning debris and packaging generated by the finish trades. Bulk construction debris removal and dumpster hauling is typically the general contractor's scope, but we'll coordinate if you want it bundled.
Yes. Storm cleanup and post-restoration handover cleaning are both services we provide, and on the Gulf Coast they come up every season.